2023 Crack Sealing and Parking Lot Maintenance Project


 

Project Location: Various streets throughout Hanover Park and the north commuter parking lot 
Phase:Construction 
Project StatusBids Received
Construction Start Date2023
Construction Completion Date:TBD
Contractor:Denler, Inc. 
Construction Engineer:In-House
Design Engineer:In-House
Awarded Construction Amount:$90,000.00
Adjusted Final Construction Amount :TBD
Funding Source(s):Local 





OBJECTIVE: 


To slow down the deterioration of the Village's asphalt pavements. 


DESCRIPTION:


This project includes crack sealing of various streets throughout the Village as well as crack sealing, sealcoating, and striping of the north commuter parking lot.  The use of a crack seal agent prevents moisture, dirt, and debris from entering the pavement at locations where it was not intended, slowing down the pavement at locations where it was not intended, slowing down the pavement deterioration.  Installation of a sealcoat helps reduce raveling (loss of aggregate) on the surface of the asphalt pavement.