| Project Location: | County Farm Rd. from Stearns Rd. to Ontarioville Rd. Church Rd. south of Ontarioville Rd. |
| Project Status: | Awaiting Construction |
| Bid Opening Date: | August 1, 2025 |
| Mandatory Pre Bid Meeting: | N/A |
| Construction Start Date: | TBD |
| Construction Completion Date: | TBD |
| Contractor: | A Lamp Concrete Contractors |
| Construction Engineer: | BLA, Inc. |
| Design Engineer: | HR Green |
| Awarded Construction Amount: | $1,424,943.48 |
| Adjusted Final Construction Amount: | TBD |
| Funding Source(s): | STP, ITEP, Local |
OBJECTIVE: Provide residents with safe and continuous non-vehicular access to Metra and Pace Buses. Eliminate existing gaps in the current multi-use path network.
DESCRIPTION: The project consists of installing a new multi-use path between existing bicycle paths. It will provide a continuous path to the Metra Station.
6/19/26 UPDATE: Path installation will resume once utility relocations take place.