Lake Street Multi-Use Path (MUP)

Project Location: Lake Street from Gary Avenue to the Metra Station
Project Status: Awaiting Construction 
Bid Opening Date: 9/19/25
Mandatory Pre Bid Meeting: TBD
Construction Start Date: TBD
Construction Completion Date: TBD
Contractor: A Lamp Concrete Contractors 
Construction Engineer: HR Green
Design Engineer: HR Green and WBK Engineering 
Awarded Construction Amount: $1,344,596.13
Adjusted Final Construction Amount: TBD
Funding Source(s): STP, Local 

OBJECTIVE:  Provide residents with a safe and continuous non-vehicular access to Metra and Pace Buses.  Eliminate existing gaps in the current multi-use path network. 

DESCRIPTION:  The project consists of the installation of a new multi-use path between existing bicycle paths.  It will provide a continuous path to the Metra Station.